Second Bath

We have been working on three projects. I got close to finnishiing the second bath, then we went to the walls. then we the floor. This monsterous project keeps growning. let me show you some of what we have been doing.

This picture shows how we blocked the tile as we waited for the glue to dry.

I guess I do not have pictures of the second bath. Here is one where we are placing the tile I used the same pattern for the floor. and edged is with a four inch strip. More pictures coming when it is cleaned and completed.

Th original cast iron tub was a right handed tub. I built the enclave or a left handed tub. The tub isin storage and I baught a new metal tub. When I get a piture, I will insert it here.

The walls for the toilet and sink. Again no picture. We moved a lot of tuff into this room so getting a picture now is not … well, it is a constructions zone. I am aout towo good working days from finnihingthe bathroom. maybe a week. but we moved on to the walls.

Finally, I return to the second bath with a camera.

Not as fancy as the first bath, but this one has the stand up shower in the cove bathtub.

A little more work to do on the door trim and the shelves and towel racks.