Back Upstairs

Having completed our living quarters, I again turned my attention to the second floor. Despite the -30 degree weather outside and the fact that I am not heating the upstairs, the temp was not too bad. It never did freeze on the second floor.

This image has an empty alt attribute; its file name is image-32.png

Cindy, now seeing that things are getting done, started explaining things that she would like to see. “Why don’t you remove that wall and make this a big room?” Good idea.

Continue reading “Back Upstairs”

Manager’s Apt

Winter came early last fall.

After we closed down the upstairs remodel, I turned my attention to the first floor “Manager’s apartment” or “Room one”.

This image has an empty alt attribute; its file name is image-20.png

At long last, we have completed this part of the project. Actually, this is the apartment in which Cindy and I will live. Here are some before and after pictures.

Continue reading “Manager’s Apt”

Historic Hotel Berry Bed and Breakfast

July 28, 2018

The overall goal of this project is to restore the Hotel Berry, while bringing it up to code.

This image has an empty alt attribute; its file name is image-4.png
This is how we corrected a severe problem caused by a previous owner.

The specific project is to ready the west half of the second floor for occupancy. This means 5 insulated rooms for beds, two baths and a larger day room. Actually, all the plumbing, including the third floor is included in this first phase making two two-hole restrooms and two three shower rooms.

Continue reading “Historic Hotel Berry Bed and Breakfast”