Next Project:

I am not certain when this picture was taken. I think it is before I bought the Berry.
The screened in porch may be ten years ago or longer.

As for the age of this picture: That tree by my neighbor’s shed took over the sidewalk and is now a stump.

I have been wanting to restore the mural for years, but many other projects take priority. These past few years have seen a definite decrease in the visibility of the mural. She is fading fast. It is now, or never.

Continue reading “Next Project:”

Second Bath

We have been working on three projects. I got close to finnishiing the second bath, then we went to the walls. then we the floor. This monsterous project keeps growning. let me show you some of what we have been doing.

This picture shows how we blocked the tile as we waited for the glue to dry.

I guess I do not have pictures of the second bath. Here is one where we are placing the tile I used the same pattern for the floor. and edged is with a four inch strip. More pictures coming when it is cleaned and completed.

Th original cast iron tub was a right handed tub. I built the enclave or a left handed tub. The tub isin storage and I baught a new metal tub. When I get a piture, I will insert it here.

The walls for the toilet and sink. Again no picture. We moved a lot of tuff into this room so getting a picture now is not … well, it is a constructions zone. I am aout towo good working days from finnihingthe bathroom. maybe a week. but we moved on to the walls.

Finally, I return to the second bath with a camera.

Not as fancy as the first bath, but this one has the stand up shower in the cove bathtub.

A little more work to do on the door trim and the shelves and towel racks.

Skylight

The stairway is the focal point of the building stretching from the first floor to the third. It is fifty three inches wide with twelve inch tread and seven inch risers. There is a large landing between each floor. The handrail sports three spokes on each tread with matching railing around the south of the second floor, and opens to both the south and west on the third.

Photo of landing between second and third floor. This is what it looked like when I bought the place.

Continue reading “Skylight”

The First Bathroom.

The first bathroom on the second floor is nearly complete.  Naturally, marrying the 1928 technology to today’s standards requires some ingenuity.  Additionally, building the first floor bathroom taught us to be very careful reworking the walls.  This becomes especially true because I am using 12×24 inch tile, A small curvature in the wall leads to a large error in tile placement. The tiles do not bend. Straight walls are essential since I want smooth walls. There is no forgiveness.

This image has an empty alt attribute; its file name is image-2-1024x768.png

Continue reading “The First Bathroom.”

Back Upstairs

Having completed our living quarters, I again turned my attention to the second floor. Despite the -30 degree weather outside and the fact that I am not heating the upstairs, the temp was not too bad. It never did freeze on the second floor.

This image has an empty alt attribute; its file name is image-32.png

Cindy, now seeing that things are getting done, started explaining things that she would like to see. “Why don’t you remove that wall and make this a big room?” Good idea.

Continue reading “Back Upstairs”

Manager’s Apt

Winter came early last fall.

After we closed down the upstairs remodel, I turned my attention to the first floor “Manager’s apartment” or “Room one”.

This image has an empty alt attribute; its file name is image-20.png

At long last, we have completed this part of the project. Actually, this is the apartment in which Cindy and I will live. Here are some before and after pictures.

Continue reading “Manager’s Apt”

Historic Hotel Berry Bed and Breakfast

July 28, 2018

The overall goal of this project is to restore the Hotel Berry, while bringing it up to code.

This image has an empty alt attribute; its file name is image-4.png
This is how we corrected a severe problem caused by a previous owner.

The specific project is to ready the west half of the second floor for occupancy. This means 5 insulated rooms for beds, two baths and a larger day room. Actually, all the plumbing, including the third floor is included in this first phase making two two-hole restrooms and two three shower rooms.

Continue reading “Historic Hotel Berry Bed and Breakfast”